Consultancy Services


Other Services

Consultancy Services

OSHAD approved audits

This training enables suitable employees to learn the basic elements of managing lifting operations. After training, candidates ought to work under the supervision of an experienced appointed person or crane supervisor until their employer has assessed them as competent to perform their duties.

Solution

The OSHAD initiatives is that OSHAD emphasizes the state of the employer's safety and health program, rather than simply inspecting for compliance with individual standards. Although many employers have a safety and health program the programs vary dramatically in scope and effectiveness. Some of the important factors include comprehensive worksite survey and hazard analysis, regular site inspection, employee hazard reporting system and response, accident and "near-miss" investigation, and injury and illness data analysis, all of which require an audit.

An employer derives many significant benefits from an effective safety and health program that provides for self-audits. These benefits arise both within and outside the ambit of the OSH Act. Employers who conduct effective self-audits receive substantial advantages in OSH Act inspections compared with those who don't. We therefore do not agree that an audit access ban is necessary to induce employers to conduct audits.

Audits of work sites done with the help Eurolink Safety ‘The Authorized Consultants’ are conducted for the purpose of health, safety, and fire hazard identification. During these surveys, assessments are made for compliance to applicable building and fire codes and the detection of unsafe hazards. Ergonomics, respirator use, hearing conservation, blood-borne pathogens and use of personal protective equipment related worksite audit is done within the compliance to Occupational Safety and Health Administration (OSHA) standards.

The third-party SRA compliance audit of OHS management systems developed and implemented against the OSHAD SF V 3.1 on annual basis.

Audit Steps

Plan & Method:

  • Pre-assessment meeting, if needed,
  • Preparation of the audit plan,
  • Review of documentation to ensure its continuing suitability,
  • Onsite audit to verify the degree of compliance,
  • Report preparation, and
  • Follow-up activities.
  • Discussion with 'top management' on the context of the organization and other core issues
  • Observation of 'acts & conditions',
  • Interviewing of relevant personnel, and
  • Review of documentation including records

Scope :

  • Internal audit against OSHAD SF in order to prepare for the upcoming 3'rd party audit by OSHAD itself for the government sector or by an 'OSHAD registered auditing company' for entities within the semi-government &/or private sector, respectively)
  • The regulatory compliance audit of 'construction environmental management plan (CEMP)' and 'operation environmental management plan (OEMP)' against the requirements of 'Environmental Agency Abu Dhabi (EAD)'
  • 2'nd party audit - audit of the supplier on behalf of the client
  • Internal audit against ISO 15189, ISO 17020, ISO/IEC 17021-1, and ISO 170257
INQUIRE NOW